MEDIA ADVISORY
 
 
 Home
 

 

 
MEDIA ADVISORY

CONTACT: Susan Harding, Acting Public Information Officer, 301-600-1385
FOR IMMEDIATE RELEASE: September 15, 2006


WATER DISTRIBUTION IMPROVEMENTS PROJECT
TO CONTINUE

Frederick, MD --. Please be advised that Mid-Atlantic Utilities, Inc. will continue water main installation from South Street and continue to West Patrick Street. A portion of the work at the intersection of South Street will require a water main shut down and may require night work. Shut down notices will be distributed to those that will be affected. A second crew will continue with the permanent trench restoration between Columbus Avenue and South Street. Scheduled dates of this portion of the construction work are Monday, September 18, 2006 through Friday, September 22, 2006.

A traffic detour will be in place, as necessary, between Catoctin Avenue and South Street for all northbound traffic on Jefferson Street. The intended detour route for all traffic heading north on Jefferson Street will be a left turn onto Catoctin Avenue to either South Street or Patrick Street. The southbound lane of Jefferson Street will remain open to normal traffic flow during Phase 2. The water main replacement will continue on Jefferson Street for approximately 3 months. Construction activity will be seen on Jefferson Street, between Prospect Blvd. and West Patrick St. through November 2006.
We regret any inconvenience this may cause in your travels and thank you for your cooperation.

IMPACT TO AREA:

Traffic control devices such as traffic cones, signs and arrow boards will be used to limit traffic to one lane during the hours of 7:00 a.m. and 5:00 p.m.
Temporary traffic detours will be installed on a daily basis, as needed, from 6:30 a.m. to 4:00 p.m. During these temporary detours, only northbound traffic will be detoured on South Jefferson Street, between Catoctin Avenue and East South Street. The intended detour route for all traffic heading north on Jefferson Street will be a left turn onto Catoctin Ave. to either South Street or Patrick Street. The southbound lane of Jefferson Street will remain open to normal traffic flow during Phase 2.
Please exercise caution when driving or walking in the vicinity of the temporary bypass piping (blue pipe along street).
Please note that during the progress of this work, parking along the street is strongly discouraged. During non-working hours, miscellaneous equipment and materials will be stored within the parking lanes of the streets as necessary.

 

 

 

 


 

 

 


 

 



 

 


 

 